Van Build 0.5
March 31st progress. DIYvan window pocket panels are in place and the beginning of DC distribution wiring are seen. The drivers side wire chases are covered and the AVC Rig wall-to-ceiling support channels are installed and upholstered. Rear window pocket surrounds are upholstered. New (cheap webbing) grab handle installed on the slider B pillar, as now that the larger tires are mounted, the van is too tall to comfortably step up into.